Your coffee roaster is almost complete.  The section of the cabinet that once held the control panel is still exposed and needs to be enclosed.

2015-12-31 17.39.26

Cut out a piece of your scrap tin in a shape that will cover the control panel mount.  It’s a good idea to file down the rough edges before you mount the enclosure.

If you connected a switch you can go ahead and mount it on your new control panel.  If not, you can just leave it blank.

Mount your new control panel on your coffee roaster.  You should be able to use the mounting hardware used to mount the original control panel.

2015-12-31 17.40.51

You’re ready to roast now.

2015-12-28 15.27.40
Coffee Roaster v. 2.0

Previous Next

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s